Production tracks every build by stage number. The Phase column on the inventory dashboard prints the same numbers, so this page is the answer to “what does Stage 6 actually mean?” — and to a buyer asking what happens next.
-
PRE
Pre-Construction
Boundary survey, plot plan, and building permit. Nothing has been built yet. On the dashboard this reads as Boundary Survey, Plot Plan, Permit in Progress, or Pre-Construction once the permit is in hand and the start is scheduled.
-
1
Lot Clear & Slab Prep
Lot clear, pad build, slab prep.
-
2
Slab & Block
Concrete slab, block walls.
-
3
Framing
Framing.
-
4
Rough-Ins
Electrical rough, tub set, HVAC rough.
Last call — all upgrade selections must be made by Stage 4 -
5
Shingles, Stucco & Drywall
Shingles, stucco, drywall.
-
6
Paint & Tile
Interior and exterior wall paint, tile.
-
7
Cabinets & Countertops
Cabinets, countertops, interior doors and trim.
-
8
Trim-Outs & Landscaping
HVAC trim, plumbing trim, electrical trim, landscaping.
-
9
Punch & Finish
Interior trim paint, carpets, knobs, punch work.
The house is ready for a blue tape walkthrough and showings -
10
Inspections & Final
All inspections, all cosmetic work.
The house is ready for CO and final walkthrough